Integrity Construction and Nickels Golf are well into the back 9 and working on the waste bunker between 13 and 14. Sand from the old bunkers was saved for the waste area. The team will preserve the local memorial trees and integrate them into the changes.
top of page
Search
Post: Blog2_Post
bottom of page
Comments